3 Season Deck Addition

Full Home Remodel & Bedroom Addition   |  Entire Home Window Replacement   |  Full Home Remodel (Kitchen & Bath) 

Clients wanted to replace their old, rotting rear deck with a three-season addition. I tore down the old deck, replaced heavily damaged framing, and constructed the addition which featured interchangeable glass panes and screens. The addition also needed to tie into their existing lower deck that was adjacent to their pool. Project was done in Fall of 2020 which presented challenges due to supply chain issues. Was responsible for project design, management and all work done with the exception of electrical. The next several slides illustrate the project from start to finish..

Clients wanted to replace their old, rotting rear deck with a three-season addition. I tore down the old deck, replaced heavily damaged framing, and constructed the addition which featured interchangeable glass panes and screens. The addition also needed to tie into their existing lower deck that was adjacent to their pool. Project was done in Fall of 2020 which presented challenges due to supply chain issues. Was responsible for project design, management and all work done with the exception of electrical. The next several slides illustrate the project from start to finish..

Original deck

Original deck

Original deck

Original deck

Original deck (with teardown begun)

Original deck (with teardown begun)

New footings installation

New footings installation

Water & insect damaged framing was found and needed to be replaced

Water & insect damaged framing was found and needed to be replaced

New deck framing installed

New deck framing installed

New decking installation

New decking installation

Walls framed

Walls framed

Rafters installed

Rafters installed

Fascia, soffits, rakes and roofing completed

Fascia, soffits, rakes and roofing completed

Texture-111 siding, trim and storm door installed

Texture-111 siding, trim and storm door installed

Removable glass panels installed, electrical & lower deck tie-in completed

Removable glass panels installed, electrical & lower deck tie-in completed